Tan metal building with a roll-up door and an open-sided lean-to on a gravel pad

Metal Buildings in Tomball, Magnolia and Waller

4K Metal Buildings & Components supplies and erects metal buildings in Tomball, Magnolia, Waller and the surrounding areas, from a garage to a warehouse. Choose a pre-engineered metal building or just the components you need.

Metal building options

  • Pre-engineered metal buildings

  • Components: roll-⁠up doors, panels, purlins, hardware and accessories

  • Deliveries

What sizes do you build?

There's no minimum job size, and we've built metal buildings up to 20,000 square feet. We'll build you a garage or a warehouse.

What does a metal building cost?

Every metal building is priced on its size and the doors and components you choose. Tell us what you have in mind and we'll give you a free estimate.

Our goal on every job

  • Highest quality material

  • Competitive pricing

  • Faster-⁠than-⁠average lead times

  • Superior installation

Metal building questions

How long does a metal building last?

A well-built steel building can last for decades. How long yours lasts depends on the quality of the panels and finish, how securely the frame is anchored to its foundation, and basic upkeep, such as keeping trim, doors and gutters in good shape.

Can you put a metal building on gravel or dirt?

Most permanent metal buildings are anchored to a concrete slab or concrete footings so the frame stays secure in high wind. Whether anything else will work depends on the building's size, how you'll use it and the engineering for that building.

Do metal buildings sweat?

They can. When warm, humid air meets cool steel, condensation forms on the inside of the roof and walls, which is common in humid parts of Southeast Texas. Insulation with a vapor barrier is the usual way to control it, especially in a shop, garage or living space.

What size metal building do I need?

Start with what goes inside: vehicles, equipment, a workshop or storage. Measure the largest items, decide how big the door openings need to be, and leave room to walk and work around everything. Tell us how you plan to use the building and we can talk through sizes when we give you your free estimate.

How long does it take to put up a metal building?

A typical metal building takes about six weeks from quote to finished building. The schedule for yours depends on the building's size and when the building package is delivered, and the site and slab need to be ready before the building goes up. Ask about your schedule when you request your estimate.

Do you handle permits?

Yes. 4K Metal Buildings & Components handles permitting.

Do you offer a warranty?

Yes. Warranty terms depend on the job, so a small job and a large metal building aren't covered the same way. Ask about the warranty for your project when you request your free estimate.

Free estimate

Get a Free Quote

We would gladly give you an estimate for the work you’re considering, free of charge.

Phone

(832) 922-8676

Hours

Monday to Friday, 7:30 am to 5 pm

Serving

Montgomery, Waller, Grimes, Washington and Walker counties, plus Tomball and Cleveland

Free estimate

Get a free quote

We would gladly give you an estimate for the work you’re considering, free of charge.